Taking on sheet metal challenges

Highlights

  1. Daken
    Daken S.p.A. is a consolidated name in the production of polypropylene plastic accessories for the automotive and fire-fighting sectors.
  2. The context
    With injection molding, Daken were bound to the molds and cannot produce off-standard. In addition, in some countries, such as Scandinavia, the USA, Canada and Australia, steel continues to be preferred, both for its strength and for a matter of philosophy. 
  3. The project 
    Daken’s sheet metal needs required a high level of customization. This approach led the company to look for a flexible technology which could help offering tailored solutions, at the same time optimizing the process. After an in-depth analysis, the choice fell on a Salvagnini flexible manufacturing system. 
  4. The outcome
    "Today our strategy is just in time, and this allows us to efficiently manage the mix of standard products and custom products without stocking huge quantities of semi-finished parts in the warehouse: a huge economic and logistic benefit," explains Luca Corrado, Daken Plant Manager.
  • Case study
    Case study: Gardesa
    Discover how Gardesa enhances sheet metal production with Salvagnini’s automation. Improve efficiency, precision, and security. Read the case study now!
    Learn more
  • Case study
    Case study: ITAB
    Discover how ITAB enhances efficiency and precision with Salvagnini’s automated sheet metal solutions. Streamline production—read the case study now!
    Learn more
  • Case study
    Case study: CMAlifts
    Learn how CMAlifts enhanced its production efficiency and increased capacity by implementing Salvagnini's automated solutions, boosting turnover by 10%.
    Learn more
  • Case study
    Case study: HAZET
    Learn how HAZET improved efficiency with Salvagnini panel benders, reducing production time by 20% while achieving high precision for tool trolleys and drawers.
    Learn more
  • Case study
    Case study: Wippro
    See how Wippro optimized production with Salvagnini's S4+P4 system, increasing automation, precision, and efficiency while reducing waste and lead times.
    Learn more
  • Case study
    Case study: Henke
    Discover how Henke GmbH boosted production with Salvagnini’s S4 + P4 FMS, reducing setup times, increasing efficiency, and meeting flexible demand.
    Learn more
  • Case study
    Case study: Erhart
    Learn how Erhart GmbH automated wall hydrant cabinet production with Salvagnini, reducing setup times, boosting efficiency, and cutting energy use.
    Learn more
  • Case study
    Case study: ICET INDUSTRIE
    See how ICET INDUSTRIE cut cycle times by 35% using Salvagnini’s S4+P4 FMS, improving flexibility, efficiency, and integrating automation seamlessly.
    Learn more
  • Case study
    Case study: Zhu Cheng
    Learn more
  • Case study
    Case study: AHT
    Learn more
  • Case study
    Case study: Panhuber
    Learn more
  • Case study
    Case study: Steurer Systems
    Learn more