    KONE Industrial manufactures elevator cabins and landing doors for global markets. Production is highly configurable and make-to-order, managing numerous dimensional options and finishes across thin-gauge sheet (typically 0.8–1.5 mm), with dedicated lines for doors and cabins governed by centralized, flexible staffing.
  2. The challenge
    High product variability and strict quality standards demanded faster throughput, fewer intermediate buffers, and tighter control of WIP. The goal: increase OEE, reduce manual handling and storage moves, and maintain traceability while sustaining intense, continuous production cycles across hundreds of part variants and options.
  3. The solution
    A new S4+P4 FMS, fed by a single-sheet MD store-tower, slots into the existing layout alongside the pre-existing lines. The flow is lean and connected: the MD supplies the S4; parts to be bent move to the P4 for panel bending and then feed directly to the B3 press brake via P4→B3 software integration, with no intermediate buffer stops. This ensures in-process traceability, automatic priority re-sequencing, and operational continuity, absorbing the variability typical of make-to-order. The outcome is a more coherent production flow with lower WIP and non-value-added time, better operator utilization, and greater predictability in lead time, quality, and production costs.
  4. The results
    For some specific components, cycle time drops from about 180 to 60 seconds. With handling and intermediate storage removed, the flow stays continuous: priorities are re-sequenced in software, operators focus on value, and a full shift is absorbed through smarter resource allocation. Selective insourcing lowers unit cost and supports a payback in under two years. “The main advantage is that we can obtain a pre-bent FAT without the need to move it,” says Mauro Mongiardo, PCU Manufacturing Solution Manager
Salvagnini case study KONE
  • Case study
    Case study: AR-CON Hellas
    Learn more
  • Case study
    Case study: Meiller
    Learn more
  • Case study
    Case study: GRITEC
    Learn more
  • Case study
    Case study: Gamko
    Learn more
  • Case study
    Case study: Tecno A
    Learn more
  • Case study
    Case study: Gardesa
    Discover how Gardesa enhances sheet metal production with Salvagnini’s automation. Improve efficiency, precision, and security. Read the case study now!
    Learn more
  • Case study
    Case study: ITAB
    Discover how ITAB enhances efficiency and precision with Salvagnini’s automated sheet metal solutions. Streamline production—read the case study now!
    Learn more
  • Case study
    Case study: CMAlifts
    Learn how CMAlifts enhanced its production efficiency and increased capacity by implementing Salvagnini's automated solutions, boosting turnover by 10%.
    Learn more
  • Case study
    Case study: HAZET
    Learn how HAZET improved efficiency with Salvagnini panel benders, reducing production time by 20% while achieving high precision for tool trolleys and drawers.
    Learn more
  • Case study
    Case study: Wippro
    See how Wippro optimized production with Salvagnini's S4+P4 system, increasing automation, precision, and efficiency while reducing waste and lead times.
    Learn more
  • Case study
    Case study: Henke
    Discover how Henke GmbH boosted production with Salvagnini’s S4 + P4 FMS, reducing setup times, increasing efficiency, and meeting flexible demand.
    Learn more
  • Case study
    Case study: Erhart
    Learn how Erhart GmbH automated wall hydrant cabinet production with Salvagnini, reducing setup times, boosting efficiency, and cutting energy use.
    Learn more